Work to repair the sanitation collector of Condesa Street in the municipality of Los Alcázares has resumed this week.
The General Directorate of Water, responsible for the work, and the Town Hall of the town dedicated in June to postpone the beginning of this work so as not to cause problems in the town center in the middle of the summer season.
The pipe rehabilitation system will be carried out by continuous sleeve and ultraviolet curing, which “consists of the inner jacket of the pipe by means of a pre-impregnated sleeve that is subsequently cured through ultraviolet lightâ€, explain the technicians of the work .
further
They add that "this process is carried out to prevent or solve the most common problems that can occur in a sanitation network."
This work, which will last approximately one month, will prevent sewage leaks to the sea, therefore a work of vital importance is conferred for the municipality.
Source: Ayuntamiento de Los Alcázares